If the standard designation has been changed for a project, all project lines, the project itself and the higher-level directories are marked with the orange exclamation mark is displayed. The exclamation mark overlays the respective basic symbol (directory
, project
line
).
As soon as a line is selected in the directory structure, the individual variables and the table are displayed in the Line assignment [Line mapping] dialog area.
You can see the change in the NB variable line.
Now you have two possibilities:
![]() | (Mapping correctly despite of NB changes) |
![]() |
Cancel assignment and save [Revoke assignment and save changes] (mapping not correct) |
Then in the
index tree the respective symbols or
are displayed.